The Displayers managed the installation and dismantle of Grand Central Terminals Holiday Fair for (6) years. Installation of the Holiday Fair required the handling and installation of (43) crates to assemble and fill the 12,000 square foot Vanderbilt Hall over a (20) men to assemble over (5) days.
Jones Lang LaSalle and The MTA asked that conceptual designs be proposed to replace existing system. The renderings and fly – through was The Displayers proposal.